Protecting a cultural landmark
Willmott Dixon Interiors delivered the £10m refurbishment of The Capitol in Horsham for Horsham District Council - the first major refurbishment of the district’s theatre and cinema venue since 2002.
Procured through the SCAPE Construction framework, the project future-proofed a building that celebrated its 90th birthday during construction, while preserving the art deco character its audiences love.
Behind a much-admired front of house, the building needed significant investment. Plant and engineering systems were reaching the end of their life, the heating and cooling system had been failing repeatedly, and plumbing, ceilings, carpets and seating all needed attention. The council shaped its brief around a survey of residents’ priorities - comfort, shorter queues, better cinema technology and accessibility throughout - and our work spanned the entire four-storey, 34,400 sq ft building: the theatre auditorium, two cinema screens, bars, box office, toilets and public areas.
Delivering to an immovable deadline
The Capitol closed after its final pantomime performance on 4 January 2026 and had to reopen for the 2026 pantomime season. That fixed date set the whole programme. Demolition and strip-out were completed in the first months, with all auditorium seating removed and the auditorium fully scaffolded so every wall and ceiling surface could be repaired, redecorated and fitted with new house lighting. The venue was handed back in October 2026 and reopens on 29 November with Dick Whittington.
What we delivered
- Full repair and redecoration of the theatre auditorium, reinvigorated in rich dark green with gold accents, plus a new house lighting system.
- New theatrical seating in traditional red, with improved layout and raking giving a 420-seat auditorium.
- Revised seating layouts with better viewing positions for wheelchair users and visitors with limited mobility, and the space to sit alongside friends and family.
- Both cinema screens upgraded with new flooring, new seating, improved audio-visual facilities and - by popular request - cupholders.
- Reconfigured toilets with additional cubicles for women to cut interval queues, and a dedicated Changing Places facility for visitors with complex needs.
- Refreshed bars, box office and gallery area, with contemporary finishes throughout the public spaces.
- End-of-life gas-fired boilers replaced with a new heating and cooling system, alongside wider mechanical, electrical and plumbing upgrades and external improvements.
Renewing public and cultural buildings
The Capitol adds to Willmott Dixon Interiors’ track record of bringing historic public and cultural buildings back to life. Recent projects include the restoration of the former Granada cinema in east London and the delivery of The Amelia Scott cultural and learning centre in Tunbridge Wells.