£29.6 million

VAlue

6,431m²

New Facilities

November 2024

Completion

Wixams Academy Expansion

Delivering a Sustainable, Future-Ready Learning Environment for Bedford

Overview


The Wixams Academy 6FE (Six-Form Entry) Expansion is a state-of-the-art education facility, designed to accommodate the growing demand for secondary school places in Bedford. Delivered in partnership with Bedford Borough Council, the project provides modern teaching spaces, a high-performance sports hall, an all-weather pitch, and multiple-use games areas (MUGAs), ensuring that students have access to first-class learning and recreational facilities.

Developed through the SCAPE 5 National Framework, the project integrates energy-efficient building design, sustainable construction methods, and flexible learning spaces, creating an innovative, adaptable school environment that aligns with Net Zero Carbon objectives.
Constructed with a hot-rolled steel frame and high-performance cladding, the new three-storey teaching block will support Wixams Academy’s long-term educational vision, providing a future-proofed infrastructure for generations of students.

Wixams_Academy-03.jpg
Project Delivery & Challenges Overcome

Delivering a major school expansion within an active campus required careful coordination and a collaborative, phased construction approach. Key challenges addressed include:

• Minimising disruption to students and staff by implementing segregated work zones and phased handovers.

• Integrating modern teaching and sports facilities into an existing school environment, requiring seamless design and logistics management.

• Ensuring the project meets Net Zero Carbon aspirations, integrating high-performance insulation, renewable energy, and advanced ventilation systems.

• Managing infrastructure upgrades, including site-wide hard and soft landscaping, improved drainage systems, and enhanced accessibility features.

Despite complex site constraints and supply chain challenges, the project remains on track for completion in November 2024, ensuring that Bedford Borough Council meets the growing demand for secondary school places.

Key Features & Educational Benefits

The Wixams Academy expansion delivers a high-quality, energy-efficient educational environment, designed to support student well-being, engagement, and academic excellence.

Modern Learning & Sports Facilities:

• New three-storey teaching block, providing flexible, technology-enabled classrooms.

• Specialist subject spaces, including science laboratories, creative arts studios, and ICT suites.

• High-performance sports hall, designed to Sport England standards.

• All-weather 3G pitch and Multi-Use Games Areas (MUGAs), supporting year-round physical education and community sports.

• Enhanced student dining and social spaces, improving the overall school experience.
Sustainable & Low-Carbon Design:

• BREEAM Excellent rating, ensuring long-term energy efficiency and sustainability.

• Highly insulated building envelope, reducing heat loss and operational energy demand.

• Natural ventilation strategies, optimising indoor air quality and student comfort.

• Sustainable Urban Drainage System (SuDS), improving stormwater management and site-wide flood resilience.

• Energy-efficient lighting and mechanical systems, reducing carbon emissions and lifecycle costs.

Through these sustainable design choices, the project delivers a cost-effective, environmentally responsible education facility, aligning with Bedford Borough Council’s decarbonisation strategy.

Wixams_Academy-03.jpg
Community & Social Impact

Beyond delivering a high-quality school expansion, the project contributes to Bedford’s local economy, employment opportunities, and long-term community development.

• Over 70% of project spend remains within 40 miles of the site, supporting local supply chains.

• Apprenticeships, work placements, and school engagement programmes, inspiring young people to explore careers in construction and engineering.

• Community access to sports and recreation facilities, ensuring that the school serves as a hub for local residents.

• Considerate Constructors Scheme (CCS) excellence, ensuring that local stakeholders remain engaged and informed throughout construction.

By focusing on sustainability, skills development, and community integration, the project leaves a lasting legacy for Bedford’s growing population.


Client Feedback

"The Wixams Academy expansion is a vital investment in the future of secondary education in Bedford. By delivering a sustainable, modern learning environment, Willmott Dixon has ensured that the school can continue to provide outstanding opportunities for students for years to come."
— Bedford Borough Council Representative

The project has been widely praised for its sustainable approach, strong stakeholder engagement, and commitment to delivering long-term educational benefits.

Wixams_Academy-09.jpg
Legacy & Future Impact

The Wixams Academy 6FE Expansion represents a best-in-class example of sustainable school construction, providing a high-performance, adaptable learning environment that meets the needs of both current and future students.

By integrating innovative design, energy-efficient systems, and a community-focused approach, the project ensures that Wixams Academy remains a beacon of educational excellence for Bedford.

With its state-of-the-art teaching facilities, modern sports amenities, and Net Zero Carbon-ready infrastructure, this expansion will support student success, well-being, and sustainability for generations to come.

PROJECT HIGHLIGHTS

Project Value: £29.6 million
Completion: November 2024
Client: Bedford Borough Council
Location: Wixams, Bedfordshire
Size: 6,431m² new teaching and sports facilities

PROJECT DETAILS