A landmark opening for Stoke-on-Trent
University of Staffordshire officially opened its £100 million Student Village on 11 September 2026, completing one of the largest investments the university has ever made in the student experience, and one of the most significant single investments in Stoke-on-Trent’s ongoing regeneration. Willmott Dixon delivered the construction for Staffordshire Campus Living, the partnership between the university, HOCHTIEF PPP Solutions and Plenary.
The Chancellor of the University, Major Levison Wood, unveiled a commemorative plaque before guests were walked round the buildings by our team. Students moved in the same week, a month after the university was named Daily Mail Modern University of the Year 2027, recognition that cited the Student Village itself among the reasons for the award.
The Village now sits alongside the £60 million Goods Yard development, the revitalisation of the historic Spode Works and the £29 million railway station and gateway programme in a city being actively rebuilt.
What we delivered
- 700 new bedrooms across six residential buildings, in a mix of contemporary cluster blocks and townhouses.
- 300 refurbished bedrooms at Clarice Cliff Court, re-fitted with low-energy systems over the summer months.
- A new Village Hub, net zero carbon in operation, four levels of individual and group study space, social and wellbeing facilities, a landscaped garden lounge, rooftop terrace and a double-height events hall.
- A new pedestrian bridge and boardwalk linking the Village to the university’s Leek Road campus.
- Accessible parkland on the former Leek Road accommodation site, targeting a 12% biodiversity net gain.
- Controlled access, 24/7 on-site security and SafeZone app coverage across the Village.
Built offsite, assembled on a campus that never closed
The superstructure for all six residential buildings went up in 32 weeks, using a fully integrated light gauge steel frame manufactured offsite and assembled on site. That approach held manufacturing tolerances to 5mm across the whole development, a result of taking the offsite decision early in design and then holding to it. The same discipline kept embodied and operational carbon low and delivered EPC A-rated homes.
All of it was built in the middle of a fully operating campus, with thousands of deliveries arriving alongside students, staff and residents. Meticulous phasing, a safety-first sequence and daily coordination between our site team, the university and our Staffordshire Campus Living partners kept the campus running throughout.
Sustainability designed in from the outset
The Village Hub (above) was designed to be net zero carbon in operation. Roof-mounted photovoltaic panels generate on-site renewable electricity and air source heat pumps supply heating and hot water, while Passivhaus principles, high levels of insulation, low U-value materials and maximised air tightness, cut demand for heating and cooling. Across the wider site, the development delivered biodiversity net gain, landscaped public space and improved pedestrian connections, making the campus greener as well as bigger.